During August I did a little more work on the garden. Mainly I was regrading and re-contouring the soil. Unfortunately the weather continued extremely wet. The water table is high in any case, but the soil gets very sticky when it's as wet as it was this summer. It made progress difficult as I couldn't really track on the same area for too long. I would have liked to hardcore more of the paths, but perhaps the winter will be drier.

got a 7 ton machine this time

hard to see what was done, but a lot of re-contouring and rough grading

took away the steep edges to the stream, and widened in places

created the first seating area in the garden

add another layer of gravel to some of the paths